What PPS has, and hasn't, made public#
In early October 2026, PPS filled in much of what had been missing. It released a family guide for each of its 81 schools, and those guides now show, school by school, the five-year enrollment estimate (2027-28 through 2031-32), whether the school meets the district's size and space-use goals, an attendance-boundary map, and student-group demographics. That is real progress and worth acknowledging. PPS has also built an interactive rightsizing dashboard, first shared by a board member and now posted on the district's rightsizing site, that adds year-by-year projected enrollment for every school under each scenario, the status-quo baseline behind its scenario claims (only 48% of students in a "sustainable" school by 2031-32 if nothing changes), and district- and region-level displacement figures. PPS rightsizing dashboard But even with all that, the public record stops short of what you'd need to independently check the plan, and six gaps still matter:
- The raw building capacity. Each family guide says only whether a school meets the 70–100% "space use goal," and some mention a building's capacity in passing (Arleta has "room for 653 students"). PPS family guides The dashboard reports only the share of buildings in that range, by grade level and region. PPS rightsizing dashboard No PPS document we've found lists every building's seat count or utilization rate, so you still can't see how close each call was, or audit the capacity figures the measure rests on. Staff described the method at the October 20 board meeting and said the model would be posted online; until it is, the numbers can't be checked. PPS: Oct 20 board meeting
- How the projections and thresholds were set. The five-year enrollment estimates and the size goals (360 students for K-5, 500 for K-8 and middle, 1,100 for high school) are published as "planning goals," but not the model, assumptions, or analysis behind them, the same data gap the district's own equity auditors flagged. And the school-level estimates come with no stated margin of error, though Portland State's own track record shows a wide one (see "The enrollment forecast").
- How many families PPS expects to lose. The dashboard's note on method says PPS moved every neighborhood student to the new school, and PPS hasn't published any rate of loss. Until it does, every receiving school's projected size assumes no family leaves (see "Why families leave"). PPS rightsizing dashboard
- What happens to the buildings. PPS has published no plan for any building it would close. Its FAQ says a plan will follow board policy on the use or sale of district property, and a spokesperson said decisions about school property will come after the board's final vote. PPS: Rightsize FAQ · Willamette Week, Oct 20 The superintendent has said some closed campuses may serve as swing sites while other schools are renovated, and that she'd prefer to lease others for child care or early learning. The Oregonian, Oct 5
- What families told PPS. The district's own January 2026 research on why families leave hasn't been published, and its results on redistricting are missing even from the copy released through a records request (see "Why families leave").
- A definition of success and an independent evaluation. PPS still hasn't said how it will measure whether a closure worked, or committed to an independent review one and three years out.
The equity results PPS highlights (for example, 80% of students in a school that meets the size goal under Scenario A, and 73% under Scenario B) are district- and region-wide totals, and every figure is a projection for the 2031-32 school year, not a current count. (The guides are equally candid that the promised benefits aren't guaranteed; see "the benefits it does promise aren't funded".) PPS scenarios · PPS family guides
These gaps are the strongest, most reasonable thing to press PPS on: before the December 15 vote, release the raw capacity and utilization numbers and the projection method behind the family guides, and commit to an independent one- and three-year evaluation if the plan passes.